|

[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 114
  • File Size 3.46 MB
  • File Count 1
  • Create Date September 5, 2023
  • Last Updated September 6, 2023

Installation & Commissioning of Low Voltage Electrical Reticulation for Ondangwa Sports Stadium and Electrical Installation to Southern Ticket Gate.

Closing Date: Wednesday, 4 October 2023 at 10h00.

Comments are closed.

Close Search Window